Sep 9, 2015 | Uncategorized
This summer brush was cut from the back side of the earthen dam and an additional 4 feet of riprap was added to the front. A large metal grate and ladder was added to the drainage silo to replace the loose boards that dam committee chairman Mike Watts has had...
Sep 9, 2015 | Uncategorized
Winter 2014 Summer 2015