Erratic weather increasing the spillway has to be a priority. Engineers at Hurst-Rosche are to design a structure that can achieve the requirements of the IDNR at the northeast corner of the dam. It also allows us to incorporate another gate into the structure that allows for a much safer lowering of the lake.